Using a 5mm drill bit, make a hole in each of the sections, there maybe pre-formed dents you can use from the original moulding process
his will allow the water that flows into the pads, to run straight out the bottom as opposed to being stuck within. They will dry-out much quicker.
pics here https://www.bimmerforums.co.uk…drain-modification.43921/